jgriffin
12-24-2005, 08:08 AM
I finished DS's Christmas stocking last night...it got down to the wire, but it's all ready for tonight! It took me nearly 2 months, about 1 1/2 months longer than I thought it would. Part of the problem was that I thought I'd be able to knit and pump at the same time, but with 5 pointy needles, 3 balls of yarn, 2 tubes and 2 bottles hanging off of me, it just didn't work. :)
DS's is in the middle; mine is on the left, DH's is on the right.
http://www.windsorpeak.com/dc/user_files/31418.jpg
DS's is in the middle; mine is on the left, DH's is on the right.
http://www.windsorpeak.com/dc/user_files/31418.jpg