ha98ed14
01-11-2013, 03:09 PM
There is a major infrastructure project scheduled to be done within a half mile of my house. They will be putting in a new road and sewer lines. It is scheduled to take 2 years, which means it will take 3+.
I am concerned about the dust from the grading of the road. There will be significant earth moving needed. I am also concerned about the diesel emissions from the construction equipment. I know from the type of work I do that DPM (diesel particulate matter) from diesel powered trucks and construction equipment is very, very toxic. I can't move my house. Can I get it hermetically sealed? Obviously we still have to open the door to go in and out; but is there anything I can do to cut down on the amount that will get into my house?
I am concerned about the dust from the grading of the road. There will be significant earth moving needed. I am also concerned about the diesel emissions from the construction equipment. I know from the type of work I do that DPM (diesel particulate matter) from diesel powered trucks and construction equipment is very, very toxic. I can't move my house. Can I get it hermetically sealed? Obviously we still have to open the door to go in and out; but is there anything I can do to cut down on the amount that will get into my house?