Page 2 of 3 FirstFirst 1 2 3 LastLast
Results 11 to 20 of 23
  1. #11
    JTsMom is offline Diamond level (5000+ posts)
    Join Date
    Mar 2005
    Location
    Atlanta, GA
    Posts
    8,666

    Default

    Quote Originally Posted by Pinky View Post
    Wow. 27 tons is a lot. Did I read that correctly? Do you know how many square feet the area is? I think if I was you I'd rent a dingo (like a bobcat only you walk behind it, you dont ride on it... less yard destruction etc) if there is no way you can have it dumped right on the spot you need it.

    It may actually be 26, not that that helps much!

    We bought this set:
    http://www.bjs.com/adventure-playset...product.124951

    We came up with the tonnage based on the following:
    With a 6 ft perimeter, it would be 30x30, but we're going to cut it back a bit on the side of the swings, a little on the front and back to make it 24x28=672 sq ft. Divide by 27 for sq yds=24.88=34.8 tons at 12" thick, 17.5ish at 6", 26.15 at 9" thick. So if we went by the strictest recs, we should technically have even more (46.6 tons!), but I'm comfortable with the compromise.

    We have a long sloping driveway, and they're bringing the gravel in on a semi which could actually fit, but would probably crack it, so they're going to dump it on the street. Luckily, the side of our yard is still just clay (new construction), so no worries about tearing up the yard.

    It's $125 to rent a Bobcat for 1/2 a day, so I'm thinking that's probably the way to go.
    Lori
    Mom to Jason 05/05
    and Zachary 05/10

  2. #12
    Pinky is offline Sapphire level (2000+ posts)
    Join Date
    Jul 2010
    Posts
    2,828

    Default

    Quote Originally Posted by JTsMom View Post
    We have a long sloping driveway, and they're bringing the gravel in on a semi which could actually fit, but would probably crack it, so they're going to dump it on the street. Luckily, the side of our yard is still just clay (new construction), so no worries about tearing up the yard.

    It's $125 to rent a Bobcat for 1/2 a day, so I'm thinking that's probably the way to go.
    Definitely check to see if they have a Dingo... well that is unless you have experience driving a bobcat. I'm sure you could figure it out but the Dingo was so easy to use and we felt like we had more control because you walk behind it rather than ride on it. It still has a loader and all that so will work just as well. It will be so worth the price of the rental. Moving rocks is HARD work, you'll be glad you got the rental for sure. Good luck!

  3. #13
    JTsMom is offline Diamond level (5000+ posts)
    Join Date
    Mar 2005
    Location
    Atlanta, GA
    Posts
    8,666

    Default

    They did have them on there for about the same price. Is using it physically draining? Not to sound like a slacker, but that's the whole point, kwim. lol

    My mom keeps wanting us to just borrow her tractor cart and wheelbarrow, but I think that's insane! I keep telling her 26 TONS!!!! They're bringing it in on a semi Mom! lol We aren't spring chickens, and we don't have tons of time to do it slowly since it'll be in the street.
    Lori
    Mom to Jason 05/05
    and Zachary 05/10

  4. #14
    Pinky is offline Sapphire level (2000+ posts)
    Join Date
    Jul 2010
    Posts
    2,828

    Default

    Quote Originally Posted by JTsMom View Post
    They did have them on there for about the same price. Is using it physically draining? Not to sound like a slacker, but that's the whole point, kwim. lol

    My mom keeps wanting us to just borrow her tractor cart and wheelbarrow, but I think that's insane! I keep telling her 26 TONS!!!! They're bringing it in on a semi Mom! lol We aren't spring chickens, and we don't have tons of time to do it slowly since it'll be in the street.
    Definitely don't use the wheelbarrow method. LOL Tell your mom she's welcome to come over and push the wheelbarrow if she feels so inclined. I hear ya about not being spring chickens. Same here.

    The Dingo moves itself so you don't have to do anything. Now that I think about it you don't even have to walk behind it because it has a little platform that you stand on, so super easy to use! We didn't have any experience with heavy machinery like that when we did one and I was honestly afraid we'd run the bobcat through the house or something. Ok, not really but it would be much easier for it to get away from you and hit a fence with the loader etc. When we went to the rental company they told us the Dingo was easier for first timers to use and then again the big factor for us was that it's not as heavy as a bobcat and doesn't tear up the rest of the ground as much. I know this sounds weird but we actually had a ton of fun with the Dingo and it made our project much much easier. We actually used it for digging post holes (installed a fence ourselves) because they have an digger attachment you can use with it.

  5. #15
    JTsMom is offline Diamond level (5000+ posts)
    Join Date
    Mar 2005
    Location
    Atlanta, GA
    Posts
    8,666

    Default

    Great, thanks for all of the info. DH will be thrilled b/c he saw them use a dingo on some landscaping show, and has been wanting to play with...er, I mean work with one ever since.

    What did you all use for the edge of your perimeter?
    Lori
    Mom to Jason 05/05
    and Zachary 05/10

  6. #16
    Pinky is offline Sapphire level (2000+ posts)
    Join Date
    Jul 2010
    Posts
    2,828

    Default

    Quote Originally Posted by JTsMom View Post
    Great, thanks for all of the info. DH will be thrilled b/c he saw them use a dingo on some landscaping show, and has been wanting to play with...er, I mean work with one ever since.

    What did you all use for the edge of your perimeter?
    Have fun with it! We seriously had a blast and played with it the whole weekend (the place we rented from was closed on Sunday so you got to keep it til Monday).

    We didn't use ours for loading gravel, we used it for digging holes so I'm not sure about edging. Our local park has that hard plastic black edging and it seems to work but I would dread digging the trench to install it properly.

  7. #17
    bubbaray's Avatar
    bubbaray is offline Blue Diamond level (20,000+ posts)
    Join Date
    Sep 2003
    Location
    BC Canada
    Posts
    20,546

    Default

    We only did 6", the area was 20x20, DH says that was 7.5 cubic yards. DH wheelbarrowed. DH says he gets different math from your numbers 9" deep should be 18.5 yards. (don't ask me, I'm just the messenger -- I can't even add!)

    FWIW, we have been plenty happy with the 6" depth.
    Melissa

    DD#1: April 2004
    DD#2: January 2007

    "My friends, love is better than anger. Hope is better than fear. Optimism is better than despair. So let us be loving, hopeful and optimistic. And we’ll change the world." Jack Layton 1950 - 2011

  8. #18
    Join Date
    Jan 2003
    Location
    Wisconsin
    Posts
    5,756

    Default

    We had a dump truck load of gravel dumped on the driveway and then we used a wheel barrow to move the pea gravel to the backyard. It was a LOT of work. :P We have about 6 inches of gravel under our set.
    ~~AngelaS~~
    Mommy to 3 girls: A, G and M. (15, 11 and 8.5)

    The education of all children, from the moment that they can get along without a mother's care, shall be in state institutions at state expense.
    – Karl Marx, "The Communist Manifesto"

  9. #19
    JTsMom is offline Diamond level (5000+ posts)
    Join Date
    Mar 2005
    Location
    Atlanta, GA
    Posts
    8,666

    Default

    Melissa, I just PM'ed you back, but I should have thought to check this post first.

    I would love to get less, so someone please find a mistake somewhere for me! I'm trying to balance a reasonable amount of safety for my crazy daredevil boys, with budget- so far, budget is losing. lol

    How did you guys arrive at 6"? I was going off of this:
    http://www.cpsc.gov/cpscpub/pubs/324.pdf

    9" does seem like a lot, but I didn't want to go with less if it wouldn't be safe b/c then we'd be shelling out all of that money for nothing, kwim? CPSC actually says 12" so that it will compress to 9", but I had to draw the line somewhere! I don't know for sure what the max fall height is, but my two big areas of concern are the monkey bars, and the rock wall. I can totally see Zachary jumping off the top of the monkey bars some day. I'm pretty sure the monkey bars are somewhere in the 5-6 ft range. If it's only 5', the min. rec is 9", so that would put me in the rec'd zone. The total height is 12'1", so that looks about right, right?

    The formulas I used I pulled from Jo's post here:
    http://www.windsorpeak.com/vbulletin...ght=pea+gravel

    "To figure out how much gravel you will need, multiply the length by the width (so in my case 22x30=660). This number is your cubic feet. Divide by 27 to get your cubic yardage (in my case about 24). A rough estimate for pea gravel is 1.4 tons per cubic yards, so multiply 24x1.4 to get about 34 tons. Voila! That is how much gravel I would need at 12" thick. You can adjust your math for various thicknesses (e.g. 6" thick would be 17 tons, 9" thick would be 25.5 tons, etc.)."

    Ooooh- I'm googling in a different tab and found a gravel calculator here
    http://www.ataktrucking.com/material...vel-calculator
    that says the cubic yards would be 18.67-hmmmmmmmm. I'm going to have to google some more, but I'm being paged. I'll be back, and I'm crossing my fingers!
    Lori
    Mom to Jason 05/05
    and Zachary 05/10

  10. #20
    bubbaray's Avatar
    bubbaray is offline Blue Diamond level (20,000+ posts)
    Join Date
    Sep 2003
    Location
    BC Canada
    Posts
    20,546

    Default

    Quote Originally Posted by JTsMom View Post
    Ooooh- I'm googling in a different tab and found a gravel calculator here
    http://www.ataktrucking.com/material...vel-calculator
    that says the cubic yards would be 18.67-hmmmmmmmm. I'm going to have to google some more, but I'm being paged. I'll be back, and I'm crossing my fingers!

    Just asked DH, he said he got 18.66 but rounded down (why? I would round that up???).

    Like in my PM, he says cubic yards is for volume (what you need), tons are for weight (what you do not want to know as they don't sell pea gravel by the ton).

    We used 6" instead of 9" because we used 4x6 rough timber as the border (ie., the border was 6" deep). ETA: Looking at ours after 2 years of rain, it doesn't look like it compressed. Its pea gravel, not chips, not sure why they would say it would compress. ETA#2: our monkey bars are over 6' high (DH, 6', can walk underneath them). There is also a platform that is the same height. I would guess they are 6.5' high?? DD#1 jumps off the monkey bars into the 6" of gravel all the time. FWIW, I know for a fact that at her school they don't have 12" or even 9" of chips under the playground. It looks more like 6" and it has compressed big time in the past year.

    I have a ton (ha ha ha) of construction pictures. I can post them tonight if they will be helpful. He did it all himself -- the site prep, the hauling of the gravel, the building of the play structure.
    Last edited by bubbaray; 03-08-2011 at 10:34 AM.
    Melissa

    DD#1: April 2004
    DD#2: January 2007

    "My friends, love is better than anger. Hope is better than fear. Optimism is better than despair. So let us be loving, hopeful and optimistic. And we’ll change the world." Jack Layton 1950 - 2011

Page 2 of 3 FirstFirst 1 2 3 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •