Quote Originally Posted by SnuggleBuggles View Post
6 weeks! Wow! So we kept our existing tub and footprint so just needed to find and fix the crazy leak, put the ceiling back together, tile, new cabinet, sink, vanity, and toilet. Project was done in 9 days.
It was done pretty fast in my book. Cabinets had to be custom made though, and of course contractors double book jobs so we knew we wouldn’t be getting someone who could just work on our job. Oh they also replaced the plumbing pipes in the tub area so that took a good 2-3 days, shower tiling was about a week, floor tiling was two to three days, toilet install and repiping the rest of the plumbing was another 2-3 days. Install of everything else and painting after the cabinets went in was about a week.

The girls bathroom refresh except for cutting the countertops (which were same slab as our bathroom so we had to wait until the master counters were cut to install counters in the girls bathroom) was a about a week to install flooring, vanity, repaint, and install lights. The girls were without a sink for about 6 weeks.


Sent from my iPhone using Tapatalk